Info
The performance of engineering tasks of the Nyíregyháza western bypass of highway No. 338. between sections 6+830 – 10+600 and 10+600 – 14+711 km
Client:
NIF Zrt.
Date of delivery:
2021.
The performance of engineering tasks of the Nyíregyháza western bypass of highway No. 338. between sections 6+830 – 10+600 and 10+600 – 14+711 km
NIF Zrt.
2021.